Prysmian – Hornsea 2 Offshore Wind Farm – August 2021 to June 2022 – 66kV Array & OSS Cables

Correll was delighted that Prysmian approached our organisation to take over the Termination and Testing contract on Hornsea 2. The Hornsea 2 project is being managed by our UK team based at our HQ depot in Skelton, North-East England.

Scope of works included:

  • Pre-project meetings
  • Evaluate existing RAMS
  • Post Lay Testing (continuity, insulation resistance, Time Domain Reflectometry and Optical Time Domain Reflectometry).
  • On the offshore assets:
    • Stripping the array cables to expose the HV cores and FO cable
    • Complete the permanent hang-off
    • Route the HV and FO cable into the TP/WTGS
    • Cleat the HV cores from the hang-off to the GIS
    • Terminate and splice the FO cable into the cabinet
    • Terminate three power cores into the GIS
    • Complete post installation testing from the onshore substation to the offshore assets (IR, TDR & OTDR)
    • Deliver an Inspection and Test Plan for the installed and tested system, forming part of key payment milestone.

Download

For further information: Contact Us

Do you have a project you would like to discuss?