• Home
  • Formosa 2 OWF (Mock-up)

Jan De Nul – Formosa 2 Offshore Wind Farm – November 2021 to December 2021 

Mock up of the Termination & Testing scope of works in preparation for works on the Formosa 2 OWF. Mock up included; cable installation, completion of the temporary and permanent hang off, stripping, routing & securing of the subsea cable, re-installation of containment, termination & testing of the subsea cabling Nexans 66Kv T-Boot, verification of the fibre optic works.

Do you have a project you would like to discuss?