Global Marine Systems – Kincardine Floating Offshore Wind Farm (Phase 2) – July 2020 to September 2021 – 1 Subsea Export Cable & 5 Array Cables 

Correll Services are delighted to be working with Global Marine Systems again to complete the Termination & Testing on one of the world’s first floating offshore wind farms The Kincardine Floating Offshore Wind Farm is located 18Km off the coast of Aberdeen.  Correll Services was responsible for: 

  • Pre-project meetings 
  • Site Visits 
  • Creations of RAMS 
  • Creation of Quality documentation 
  • Project HIRA meetings 
  • Post lay testing (continuity, IR, TDR & OTDR) 
  • Onshore export cable stripping and routing 
  • Onshore export jointing of the HV & FO cables 
  • On the offshore asset: 
    • Stripping the export cable to expose the HV cores and fibre optical cable 
    • Complete the permanent hang off 
    • Route the HV and FO cable into the asset 
    • Install transit blocks around the HV core and FO cable 
    • Cleat the HV cores from the hang off to the GIS  
    • Terminate and splice the FO cable into the cabinet 
    • Terminate three power cores into the GIS 
    • Complete post installation testing from the onshore substation to the floating asset (VLF, IR, TDR & OTDR) 