Global Marine – Acadis OST 1 – September 2022 to November 2022 – 27 Array Subsea Cables
The Correll Group, Electrical Engineering Division (CEE) have been successful in securing a contract from the Global Marine Group for the post installation integrity testing of all 27 inter-array cables on the Arcadis Ost 1 offshore wind farm.
Arcadis Ost 1 is located in the Baltic Sea, 19 km northeast of the island of Rügen in Germany. Spanning an area of 29 km² and consisting of 27 Vestas V 174 – 9.5 MW wind turbines, Arcadis Ost 1 will have the capacity of 257 MW when fully operational, producing enough green energy to power up to 290,000 households.
The summary of work included:
Following completion of the offshore phase two spare IACs were offloaded to reels and the following tests were undertaken;
On the offshore assets: