Deme – Dogger Bank A OWF – January 2023 to Present – Termination & Testing of 66kV inter-array cables
Correll Electrical Engineering has been contracted by Deme Offshore NL B.V. to complete the 66kV inter-array cable (IAC) termination & testing on 95 WTG’s and the offshore substation platform on the first phase of Dogger Bank Wind Farm, including the installation of a Cable Monitoring System.
The offshore wind farm is being constructed in three 1.2GW phases; Dogger Bank A (with 95 wind turbines), Dogger Bank B (with 95 wind turbines), Dogger Bank C (with 87 wind turbines). The 3.6GW project will be the world’s largest offshore wind farm when completed in 2026.
Scope of supply can be summarized as following:
Scope of work (but not limited to} the following elements: