Hellenic – Revolution OWF – January 2024 to Present – Termination & Testing of 66kV inter-array cables – 65 WTGs, 13 Strings. 2 OSS

The Correll Group, Electrical Engineering Division is pleased to announce that it has been successful in securing a contract with Hellenic Cables for the termination and testing of the inter array cables on the Wind Turbine Generators and Offshore Substation for the Revolution Wind Offshore Wind Farm.

Located approximately 15 nautical miles offshore southeast of Point Judith, Rhode Island, the approved version of the project will have an estimated capacity of 704 MW of clean energy, capable of powering nearly 250,000 homes.

Revolution Wind will supply 704 MWs of clean, affordable offshore wind power – providing 304 MW to Connecticut and 400 MW to Rhode Island. Located approximately 15 miles south of the Rhode Island coast, 32 miles southeast of the Connecticut coast and 12 miles southwest of Martha’s Vineyard.

Correll Group is responsible for the following activities: –

  • Preparation of project specific engineering documentation & procedures.
  • Planning assistance & coordination of the works.
  • Onshore Mock-up trials.
  • Hand over tests at Employers Storage Location.
  • IPC HV cable installation & cleating, HV terminations at GIS, Transformer and Auxiliary transformer including HV cable testing at 2 x OSS in an international Onshore shipyard (Singapore)
  • PCC Subsea cable terminations offshore at each WTG including installation of permanent hang-off, cable stripping and fixing, HV termination and testing, FO terminations and testing
  • PCC Subsea cable terminations offshore at 2 x OSS including installation of permanent hang-off, cable stripping and fixing, HV termination and testing, FO terminations and testing
  • Mechanical Completion Certificate and Associated Documentation.

Download

For further information: Contact Us

Do you have a project you would like to discuss?