• Home
  • Formosa 2 OWF Cable Repair

Jan De Nul – Formosa 2 OWF Cable Repair – July 2023 to August 2023 – IAC between 2x WTGs

Jan De Nul approached Correll Cable Installation and Power Services Division to support them with the cable pull/replacement on Formosa 2 Offshore Wind Farm.

Correll were responsible for the removal of the damaged IAC between x2 Wind Turbine Generators (WTGs) and the installation, termination and testing of the replacement IAC.

Scope of work included:

  • Mobilising Technicians and Offshore Installation Manager 
  • Pre-project meetings 
  • Creations of RAMS 
  • Creation of quality documentation 
  • Project HIRA meetings 
  • On the offshore assets: 
    • Cutting of existing array cables ready for extraction
    • Cable Pull operation.
    • Stripping the array cables to expose the HV cores and FO cable
    • Complete the permanent hang-off
    • Route the HV and FO cable into the OSS/WTGS
    • Cleat the HV cores from the hang off to the GIS
    • Terminate and splice the FO cable into the cabinet
    • Terminate power cores into the GIS

For further information: Contact Us

Do you have a project you would like to discuss?