  • Asso Subsea – Kaskasi II OWF

Asso Subsea – Kaskasi II OWF – April 2022 to May 2022 – 155kV Export Cable Pull-in 

Correll Group were delighted that Asso Subsea awarded our organisation their first contract for the cable pull in contract on the Kaskasi ll project. Correll was responsible for:

  • Pre-project meetings
  • Creation of RAMS
  • Post Lay Testing (continuity, insulation resistance, Time Domain Reflectometry and Optical Time Domain Reflectometry).
  • On the offshore assets:
    • Cable pull of export cables between 2 x platforms
    • Installation of the cable pull-in quadrants
    • Tone generation testing
    • Deliver an Inspection and Test Plan for the installed and tested system, forming part of key payment milestone.

** Correll Electrical Engineering Division will complete the Termination and Testing of the export cable associated with the ZTT contract**